Home Project Info Tasks Schedule Publications Meetings/Events Partners Results Documents Contacts
 

Task 8 System Engineering

MiLi Task 8 System Engineering Details
TaskTitleDescriptionLeadParticipants
8.1Concurrent Requirement DefinitionThe concurrent design approach (methodology) aids a better and mutual understanding of the technical issues at early stages. This in turn results in a clear formulation of the essential design drivers and constraints.ALL
8.2Concurrent Design DefinitionThe concurrent design approach (methodology) aids a better and mutual understanding of the technical issues at early stages. This in turn results in a clear formulation of the essential design drivers and constraints.ALL
8.3LIDAR Full System Integration and VerificationAll subsystems are assembled together (opto-mechanical, electronics and software) and functionally tested at laboratory level. All physical and operational requirements shall be verified prior to LIDAR validation and characterization is done through tasks 7.4 and 7.5. INTAPOLIMI, York U
8.4Instrument System EngineeringThrough-out the whole project, INTA shall coordinate all technical activities, assuring the correct communications among the difference disciplines, not only between scientific and engineering groups, but also within the optical, mechanical, electronics and software subsystems. INTA will also be responsible to capture within the Design Justification File, all the design selections rationales, the resulting analysis and trade-offs, the results of the verifications and in general, anything which demonstrate that the design meets the baseline requirements. Finally, INTA will be also responsible of providing the instrument User Manual..INTA